A B2B checklist for approving wall hung toilet samples before production and shipment planning.
Approve the Model and Drawing Together
The sample should match the selected model reference and approved technical drawing. If the sample is reviewed without a drawing revision, later production checks become unclear.
Check Visible and Functional Fit
Surface finish, seat fit, fixing holes and concealed cistern compatibility should be reviewed before production approval. Avoid recording unconfirmed features as standard.
Keep a Production Reference
For repeat orders, keep photos, drawing files and approval notes linked to the approved sample.
Buyer Checklist
- Confirm product model.
- Record technical drawing revision.
- Check bowl surface and seat fit.
- Review concealed cistern compatibility.
- Approve logo, label and carton artwork.
- Keep sample approval records.
Related Product and Project References
| Product categories | Wall Hung Toilets |
|---|---|
| Product models | TT506C |
| Project references | residential development bathrooms |
| Support | OEM & ODM Quality Contact |
FAQ
What is the sample approval record?
It is the buyer record of approved model, drawing revision, sample notes and packing details.
Should carton printing be checked with the sample?
Yes, if private-label packaging or model-specific carton marks are required.
Can mass production start before approval?
Production should follow the buyer-approved sample and agreed documents.